logo
Notícias
Casa > Notícias > Notícias da Empresa What to Do for CNC Machine Tool Maintenance During Spring Festival?
Eventos
Contacte-nos
86-021-61195255
Contacte agora

What to Do for CNC Machine Tool Maintenance During Spring Festival?

2026-02-06

Últimas notícias da empresa sobre What to Do for CNC Machine Tool Maintenance During Spring Festival?

Guide to Maintenance of Machine Tools during Spring Festival

As the Spring Festival holiday approaches, machine tools will be idle for extended periods. To ensure stable operation during the break, timely troubleshooting and diagnostics should be conducted beforehand. This not only guarantees normal machine performance and extends service life but also enhances industrial efficiency and safeguards corporate profitability. SMTCL has compiled essential maintenance guidelines for machine tools during the holiday season.

 

SMTCL 4 Axis CNC Milling Machine VMC1000Q High precision Aluminum Alloy Processing Vertical Machining Center

 

Precautions for Year-End Shutdown

Cleaning/Rust-proofing/Moisture-proofing/Rodent-proofing

1. Clean the machine tool interior, worktable area, front and rear door slides, tool magazine interior, and the tool changer arm of chips.

2. Clean the chips from the external chip breaker.

3. Remove the tool from the spindle and clean the spindle end face, inner taper hole, and accessory head.

últimas notícias da empresa sobre What to Do for CNC Machine Tool Maintenance During Spring Festival?  0

4. Remove, clean, and reinstall the air conditioning filter and oil cooler filter in the electrical control box.

últimas notícias da empresa sobre What to Do for CNC Machine Tool Maintenance During Spring Festival?  1 

 

Return to Position

1. Move the Y-axis of the CNC machine tool to the midpoint and reset the Z-axis to zero.

2. Turn off the main power switch of the machine tool, the transformer inlet switch, and the air supply.

últimas notícias da empresa sobre What to Do for CNC Machine Tool Maintenance During Spring Festival?  2 

 

Post-New Year Power-On Precautions

1. Inspection of machine tool power supply and air supply. Confirm the stability of voltage and air pressure, and connect the air hose after verifying the air quality (free from water and dust).

2. Inspect the electrical cabinet. Open the cabinet to confirm no condensation, no debris, and no signs of wiring damage.

3. Inspection of lubrication and hydraulic systems. Check whether the oil quality and liquid levels in all lubrication and hydraulic systems are normal, confirm the availability of lubricating oil and hydraulic oil coolant, and ensure timely replenishment.

últimas notícias da empresa sobre What to Do for CNC Machine Tool Maintenance During Spring Festival?  36. Warm-up. After powering on the machine tool, release the emergency stop and allow the electrical components to warm up for 30 minutes.

7. Preheating. After warm-up, run idle for 1 hour, then slowly reciprocate each servo shaft for thorough lubrication. Start low-speed rotation of the spindle, gradually increasing both speed and rotation rate.

 

 

SMTCL VMC850Q 3 Axis Vertical Machining Center 4 Axis CNC Milling Machine With Turntable

 

If you want to inquire about any SMTCL products, please contact us

E-mail: sales@huidijd.com

 

 

 

 

 

 

 

 

 

Envie a sua consulta directamente para nós

Política de Privacidade China Boa Qualidade Máquinas do torno do CNC Fornecedor. Copyright © 2021-2026 lathes-machine.com . Todos os direitos reservados.